
Diamond core, reverse circulation and geotechnical programs across the high desert. Hard rock, bad roads, night shifts — Gorilla Drillers turns a claim map into logged, boxed, defensible core.

HQ, NQ and BQ wireline programs to 3,000 ft. Oriented core, high recovery, logged and boxed at the collar.
Fast, dry-sample RC for grade control and first-pass exploration. Cyclone-split intervals bagged to your spec.
Sonic, auger and mud rotary for foundations, tailings, monitoring wells and Phase II investigations.
Production wells, piezometers and pump-test installs for mine sites, ranches and municipal districts.
Own dozer and backhoe support. We cut the road, build the pad, drill the hole, then reclaim it.
Two-shift crews with lighting plants and on-site fuel. The rig does not sleep when your program is on the clock.



Track-mounted and skid core rigs, buggy-mounted RC, and our own dirt equipment so a bad two-track never becomes a standby day. Rod, barrels, bits and reaming shells stocked in the Hawthorne yard — no waiting on a supply truck out of Reno.
Core comes out of the barrel and into the box the way it came out of the ground — oriented, blocked, depth-marked and photographed before it leaves the pad. Runs are logged with recovery and RQD, and boxes are banded and staged for pickup the same shift.



Four-wheel-drive F-150 and F-350 crew trucks with headache racks and shop boxes, a water truck, a fuel trailer and our own dirt equipment. If the claim block has no road, we cut one — nobody sits on standby waiting for a subcontractor out of Reno.

4x4 crew cabs on every pad, rigged with racks, spares and radios.

Rod, bits, barrels and core boxes stocked in-house, loaded before dawn.

Dozer, backhoe and water truck — access built and reclaimed by us.

Lighted pads, fueled rigs and rotating crews out of Hawthorne, Tonopah and Ely. When your permit window is short, we run around the clock.

Every hand trained and current before boots hit the pad.
Written hazard analysis and toolbox talk each shift change.
Nevada water well and drilling contractor licensed, fully insured.
Sumps closed, pads recontoured, BLM notice conditions met.
Give us collar coordinates, target depth and access notes. Most bids go back inside two business days, and we will tell you straight if a program is better served by another method.